Reconstruction of StarĂ½ Most in Bratislava

For the reconstruction of the old bridge (starĂ½ most) in Bratislava, a temporarily support on a barge was designed to aid the skidding operation.

Marine Heavy Lift Partners were asked to verify the structural integrity of the barge Lastdrager 12 from Van der Wees.

The complexity of the problem and the heavy loads involved, required a detailed non-linear FEM analysis. The barge has carefully and cleverly been reconstructed as a finite element model. The model was used to check the internal strength due to deck loading and global hull deformation.

Following the analysis, MHLP suggested a modified deck layout that resulted in an efficient and practical solution.

Summary

Year2015
OperationSkidding operation
ClientKoninklijke Van der Wees Groep B.V.
ResponsibilityStructural check of Lastdrager 12
Kind of service Engineering