Strength calculation of barge WB 3

For a steel bridge transport the structural strength of Wagenborg Barge 3 was checked.

For this project a steel girder bridge was transported on the barge WB 3. A skidding method was used for the load-out operation. The support rails were applied near the aft and fore. This resulted in a hogging moment in the barge.

Marine Heavy Lift Partners was involved in checking the global and local strength of the barge and modifying the design of the load spreaders.

Summary

Year2015
OperationStrength calculation of barge WB 3.
ClientWagenborg Towage & Wagenborg Nedlift
ResponsibilityStrength calculations