Docking TODCO 200
Docking the mat supported Jack-up oil rig TODCO 200 on board of barge Mobile Heavy Lifter
Marine Heavy Lift Partners did the calculations for the submerging stages and calculated the internal strength of barge Mobile Heavy Lifter. Supervision during the loading operation was also the responsibility for MHLP.
Summary
| Year | 2007 |
| Operation | Docking mat supported rig TODCO 200 on board Mobile Heavy Lifter |
| Client | Atlantic Marine - Mobile |
| Responsibility | Calculation submerging steps and internal strength, supervision loading operation |
