Shaikh Khalifa Causeway Bridge load-out and installation

Load-out and Installation of the Shaikh Khalifa Causeway Bridge in Bahrain

Marine Heavy Lift Partners performed the complete engineering of the seafastening design and did the hydrostatic calculations. We also wrote detailed procedures in a method statement and were responsible for the barge operation.

Summary

Year 2002
Operation Shaikh Khalifa Causeway Bridge load-out and installation
Client MCS / Brambles Heavy Contracting
Responsibility seafastening design, engineering, hydrostatic calculations, barge operation.
Kind of service