Transport 2 continuous ship unloaders
Transport of two continuous ship unloaders on board Semco Giant V.
Marine Heavy Lift Partners designed the rails for the ro-ro operation and the sea fastening. Ro-ro calculations were also performed.
Marine Heavy Lift Partners did the warranty survey and supervision for the loading and discharging operations.
Summary
| Year | 2005 |
| Operation | Transport 2 CSU's |
| Client | Thyssen Krupp Fördertechnik |
| Responsibility | Design rails and seafastenings, ro-ro calculations, warranty survey of loading and discharging operations |
