Transport two continuous ship unloaders

Transport 2 continuous ship unloaders from Ghangzhou to Huilai PR China

Marine Heavy Lift Partners designed the rails for the ro-ro operations, calculated the accelerations and did the ro-ro calculations. Marine Heavy Lift Partners was also responsible for the survey of the loading and discharging operation as well as the securing.

Summary

Year 2006
Operation Transport 2 CSU's
Client Thyssen Krupp Fördertechnik
Responsibility Ro-ro calculations, design of rails and sea fastening, warrenty survey.
Kind of service